L Tower Construction Schedule September 17 – 21
September 14, 2012 Leave a comment
This is the current construction schedule for 8 The Esplanade – L Tower – for September 17 – 21, 2012
Updated September 18, 2012
Monday, September 17
- A delivery of heat pumps at 7:00 am.
- A second delivery of heat pumps at 10:00 am.
- A rebar (steel) delivery starting at 12:30 pm.
- Please note:
- There may be some short-term disruptions to vehicular traffic while delivery trucks are unloaded.
- To ensure public safety pedestrian and cycling traffic may also be disrupted briefly during crane lifts and swings.
Tuesday, September 18
- A delivery of drywall and metal studs starting at 8:00 am.
- A second delivery of drywall and metal studs starting at 10:00 am.
- Please note:
- There may be some short-term disruptions to vehicular traffic while delivery trucks are unloaded.
- To ensure public safety pedestrian and cycling traffic may also be disrupted briefly during crane lifts and swings.
Wednesday, September 19
- A rebar (steel) delivery starting at 7:00 am.
- Please note:
- There may be some short-term disruptions to vehicular traffic while delivery trucks are unloaded.
- To ensure public safety pedestrian and cycling traffic may also be disrupted briefly during crane lifts and swings.
- A 215M (cubic metre) slab concrete pour at level 59, starting at 9:00 am, which is not expected to extend beyond 7:00 pm.
Thursday, September 20
- A rebar (steel) delivery starting at 7:00 am.
- Please note:
- There may be some short-term disruptions to vehicular traffic while delivery trucks are unloaded.
- To ensure public safety pedestrian and cycling traffic may also be disrupted briefly during crane lifts and swings.
- A 96M (cubic metre) part one (1), wall and column concrete pour, levels 59 – 60, starting at 1:00 pm, which is not expected to extend beyond 7:00 pm.
Friday, September 21
- A 92M (cubic metre) part two (2), wall and column concrete pour, levels 59 – 60, starting at 1:00 pm, which is not expected to extend beyond 7:00 pm.
NOTES:
A Paid Duty Police Officer is on-site daily Monday to Friday, from 7:00 am to 4:00 pm daily to assist with traffic control.
Please click here for a downloadable construction summary: L Tower & Backstage Construction September 8-14