Backstage Construction Schedule – May 7 – 11

This is the current construction schedule for 1 The Esplanade – L Tower parking and
Backstage condominium for May 7 – 11, 2012

Posted May 04, 2012

Monday, May 7

  • Between 9 am and 3 pm, Deep Foundation, will be “float out” the drill rig from the site at 1 The Esplanade on a large truck, under police escort.
    • Pedestrian and vehicular traffic will be impacted during this operation. 
    • Please check back on May 7 for a more precise time for the “float out.”
  • Subcontractor, GFL Excavating will be removing material from the site: six (6) dump trucks will take 5 loads each, for a total of 30 loads.

Tuesday, May 8

  • Subcontractor, GFL Excavating will be removing material from the site: six (6) dump trucks will take 5 loads each, for a total of 30 loads.

Wednesday, May 9

  • Subcontractor, GFL Excavating will be removing material from the site: six (6) dump trucks will take 5 loads each, for a total of 30 loads.

Thursday, May 10

  • Subcontractor, GFL Excavating will be removing material from the site: six (6) dump trucks will take 5 loads each, for a total of 30 loads.

Friday, May 11

  • Subcontractor, GFL Excavating will be removing material from the site: six (6) dump trucks will take 5 loads each, for a total of 30 loads.

* * *

NOTES:

All the piles and caissons are complete on the site.

Paid Duty Police Officer is on-site daily Monday to Friday, from 7:00 am to 4:00 pm daily to assist with traffic control.

Click on the link for a printable PDF of the L Tower and Backstage May 7 – 11 summary highlights: L Tower & Backstage Construction May 7 – 11

Backstage – 1 The Esplanade: Drill Rig delivery April 11

This is a construction update for 1 The Esplanade – L Tower parking and Backstage condominium for April 11, 2012

Posted April 10, 2012

Wednesday, April 11

  • Subcontractor, Deep Foundation, will be delivering a drill rig to the site at 1 The Esplanade after 9 am, under police escort. 
    • There will be short-term disruptions to vehicular and pedestrian traffic. The construction management team apologizes for any short-term inconvenience this may cause.

Backstage Construction Schedule – April 9 – 13

This is the current construction schedule for 1 The Esplanade – L Tower parking and Backstage condominium for April 9 – 13, 2012

Updated April 10, 2012

NOTE: Subcontractor, Deep Foundation will be delivering a large drill rig to the site at 1 The Esplanade in order to complete the piles and caisson work this week. The delivery date is not confirmed at the time of posting. Please check back for updated information.

Monday, April 9

  • Subcontractor, Deep Foundation, will be installing a second row of tie backs.
  • Subcontractor, GFL Excavating will be removing material from the site: 4 dump trucks will take 5 loads each, for a total of 20 loads.

Tuesday, April 10

  • Subcontractor, Deep Foundation, will be installing a second row of tie backs.
  • Subcontractor, GFL Excavating will be removing material from the site: 4 dump trucks will take 5 loads each, for a total of 20 loads.

Wednesday, April 11

  • Subcontractor, Deep Foundation, will be delivering a drill rig to the site at 1 The Esplanade after 9 am, under police escort.
    • There will be short-term disruptions to vehicular and pedestrian traffic. The construction management team apologizes for any short-term inconvenience this may cause.
  • Subcontractor, Deep Foundation, will be installing a second row of tie backs.
  • Subcontractor, GFL Excavating will be removing material from the site: 4 dump trucks will take 5 loads each, for a total of 20 loads.

Thursday, April 12

  • Subcontractor, Deep Foundation, will be installing a second row of tie backs.
  • Subcontractor, GFL Excavating will be removing material from the site: 4 dump trucks will take 5 loads each, for a total of 20 loads.

Friday,  April 13

  • Subcontractor, Deep Foundation, will be installing a second row of tie backs.
  • Subcontractor, GFL Excavating will be removing material from the site: 4 dump trucks will take 5 loads each, for a total of 20 loads.

* * *

NOTES:

Paid Duty Police Officer is on-site daily Monday to Friday, from 7:00 am to 4:00 pm daily to assist with traffic control.

Click on the link for a printable PDF of the L Tower and Backstage April 9 – 13 summary update: 1+8 The Esplanade – Construction Notice-April-9-13

Backstage Construction Schedule – March 26 – 30

This is the current construction schedule for 1 The Esplanade – L Tower parking and Backstage condominium for March 26 – 30, 2012

Posted March 23, 2012

NOTE: The job site at 1 The Esplanade is in transition from GFL Excavating to Deep Foundation for the completion of pile and caisson work and starting at the second row tie back. There will be a drill rig and tie back drill delivered to the site but the delivery date are not confirmed at this time. Please check back for updates.

Monday, March 26

  • Sub-contractor, GFL Excavating, preparing caisson walls for Deep Foundation tie back installation.

Tuesday, March 20

  • Sub-contractor, GFL Excavating, preparing caisson walls for Deep Foundation tie back installation.

Wednesday, March 21

  • Sub-contractor, GFL Excavating, preparing caisson walls for Deep Foundation tie back installation.

Thursday, March 22

  • Sub-contractor, GFL Excavating, preparing caisson walls for Deep Foundation tie back installation.

Friday, March 23

  • Sub-contractor, GFL Excavating, preparing caisson walls for Deep Foundation tie back installation.

* * *

NOTES:

A Paid Duty Police Officer is on-site daily Monday to Friday, from 7:00 am to 4:00 pm daily to assist with traffic control.

Click on the link for a printable PDF of the L Tower and Backstage March 26 – 31 summary update: L Tower & Backstage Construction March 26-31

1 The Esplanade – Construction Schedule December 12 – 16

This is the current construction schedule for 1 The Esplanade – L Tower parking and Backstage condominium for the week of December 12 – 16, 2011

Posted December 9, 2011

Monday, December 12

  • Sub-contractor Deep Foundation will be installing tie backs.
  • Sub-contractor GFL Excavating removing bulk. 5 dump trucks 5 rounds each.

Tuesday, December 13

  • Sub-contractor Deep Foundation will be installing tie backs.
  • Sub-contractor GFL Excavating removing bulk. 5 dump trucks 5 rounds each.

Wednesday, December 14

  • Sub-contractor Deep Foundation will be installing tie backs.
  • Sub-contractor GFL Excavating removing bulk. 5 dump trucks 5 rounds each.

Thursday, December 15

  • Sub-contractor Deep Foundation will be installing tie backs.
  • Deep Foundation delivering drill rig with police escort.
  • Sub-contractor GFL Excavating removing bulk. 5 dump trucks 5 rounds each.

Friday, December 16

  • Sub-contractor Deep Foundation will be installing tie backs.
  • Deep Foundations drilling piles and caissons. 5 concrete truckloads.
  • Sub-contractor GFL Excavating removing bulk. 5 dump trucks 5 rounds each.

NOTES:

A Paid Duty Police Officer is on-site daily Monday to Friday, from 7:00 am to 4:00 pm daily to assist with traffic control.

Update for Friday October 7 and Saturday October 8

This is an update for 1 The Esplanade for Friday, October 7:

Sub-contractor Deep Foundation will be floating out the drill rig from The Esplanade gate. The float will arrive under police escort between 10:00 am and 1:00 pm. Once loaded the float will leave under police escort.

During these hours there will be significant impact on pedestrian and vehicular traffic.

The construction management team apologizes in advance for any temporary inconvenience. All efforts will be made to ensure the operation is carried out as efficiently and safely as possible.

This is an update for 8 The Esplanade for Saturday October 8:

Dominus and Sub-contractor, Premform will work from 9:00 am – 2:00 pm on the L Tower site.

Construction Schedule October 3 – 7

This is the current construction schedule for 8 The Esplanade – L Tower and 1 The Esplanade – L Tower Parking + Backstage for the week of October 3 – 7, 2011

 

Posted: September 30, 2011

 

Monday, October 3

 

8 The Esplanade – L Tower

  • There will be a 180M concrete pour, which may go beyond 7:00 pm.

1 The Esplanade – L Tower Parking + Backstage

  • Sub-contractor, Deep Foundation will be drilling caissons and piles.
  • There will be 10 loads of concrete delivered throughout the day.

Tuesday, October 4

 

8 The Esplanade – L Tower

  • There will be a 90M concrete pour, which may go beyond 7:00 pm.

1 The Esplanade – L Tower Parking + Backstage

  • Sub-contractor, Deep Foundation will be drilling caissons and piles.
  • There will be 10 loads of concrete delivered throughout the day.

Wednesday, October 5

 

8 The Esplanade – L Tower

  • There will be a 90M concrete pour, which may go beyond 7:00 pm.

1 The Esplanade – L Tower Parking + Backstage

  • Sub-contractor, Deep Foundation will be drilling caissons and piles.
  • There will be 10 loads of concrete delivered throughout the day.

Thursday, October 6

 

8 The Esplanade – L Tower

  • There will be a 72M concrete pour, which may go beyond 7:00 pm.

1 The Esplanade – L Tower Parking + Backstage

  • Sub-contractor, Deep Foundation will be dismantling the drill rig on site.

Friday, October 7

 

8 The Esplanade – L Tower
  • No concrete scheduled.

1 The Esplanade – L Tower Parking + Backstage

  • Sub-contractor, Deep Foundation will be dismantling the crane on site.
NOTE 1: Several daily deliveries throughout the week with little or no impact on traffic.
NOTE 2. A Paid Duty Police Officer is on-site daily from 7:00 am to 4:00 pm Monday through Friday. A security guard on site from 4:00 pm – 6:00 am daily.

Caisson Drilling at 1 The Esplanade

Drilling at 1 The Esplanade

image

Drill at work on The Embankment - 1 The Esplanade

image

Steel piles wating to be placed into the caissons

image

Steel and drill. 1 The Esplanade.

image

Casisson drilling.

image

Crane & Sky. 25 The Esplanade in the background.

image

Drill at 1 The Esplanade seen from Platform 1 Union Station.

Active construction photographs at 1 The Esplanade, site of the Backstage Condominium and the L Tower’s underground parking, from the week of August 22.

Drill Rig Delivery & Off-loading – July 15

Friday, July 15, sub-contractor Deep Foundation will be delivering a drill rig to the 1 The Esplanade site. It will be floated in at The Esplanade Gate just immediately west of Scott Street.

This float will arrive between 9:30 am and 11:30 am via Scott Street.

Unfortunately, pedestrian and vehicular traffic will be impacted when the float arrives and the drill rig is off-loaded. However, it is crtical ensure public safety while the drill rig is being delivered and off-loaded. The float will be escorted by Toronto Police Service vehicles.