L Tower Concrete & Rebar, June 5, 2012

Concrete truck backing into the site at the L Tower, June 5, 2012

 

Concrete truck at the L Tower, June 5, 2012

 

Rebar delivery at the L Tower, June 5, 2012

 

Rebar delivery at the L Tower, looking east from Yonge Street, June 5, 2012

Backstage Construction Schedule – April 30 – May 4

This is the current construction schedule for 1 The Esplanade – L Tower parking and
Backstage condominium for April 30 – May 4, 2012

Posted April 27/12

Monday, April 30

  • Subcontractor, Deep Foundation, will be drilling piles and caissons.
    • There will be five loads of concrete delivered to the site.
  • Subcontractor, GFL Excavating will be removing material from the site: six (6) dump trucks will take 5 loads each, for a total of 30 loads.

Tuesday, May 1

  • Subcontractor, Deep Foundation, will be drilling piles and caissons.
    • There will be five loads of concrete delivered to the site.
  • Subcontractor, GFL Excavating will be removing material from the site: six (6) dump trucks will take 5 loads each, for a total of 30 loads.

Wednesday, May 2

  • Subcontractor, Deep Foundation, will be drilling piles and caissons.
    • There will be five loads of concrete delivered to the site.
  • Subcontractor, GFL Excavating will be removing material from the site: six (6) dump trucks will take 5 loads each, for a total of 30 loads.

Thursday, May 3

  • Subcontractor, Deep Foundation, will be drilling piles and caissons.
    • There will be five loads of concrete delivered to the site.
  • Subcontractor, GFL Excavating will be removing material from the site: six (6) dump trucks will take 5 loads each, for a total of 30 loads.

Friday, May 4

  • Subcontractor, Deep Foundation, will be drilling piles and caissons.
    • There will be five loads of concrete delivered to the site
  • Subcontractor, GFL Excavating will be removing material from the site: six (6) dump trucks will take 5 loads each, for a total of 30 loads.

* * *

NOTES:

Paid Duty Police Officer is on-site daily Monday to Friday, from 7:00 am to 4:00 pm daily to assist with traffic control.

Click on the link for a printable PDF of the L Tower and Backstage April 30 – May 4 summary highlights: L Tower & Backstage Construction April 30-May 4

Backstage Construction Schedule – April 16 – 20

This is the current construction schedule for 1 The Esplanade – L Tower parking and Backstage condominium for April 16 – 20, 2012

Posted April 13, 2012

Monday, April 16

  • Subcontractor, Deep Foundation, will be installing tie backs and drilling piles and caissons.
    • There will be two (2) concrete trucks doing four rounds each (8 in total) in and out of the site.
  • Subcontractor, GFL Excavating will be removing material from the site: four (4) dump trucks will take 5 loads each, for a total of 20 loads.

Tuesday, April 17

  • Subcontractor, Deep Foundation, will be installing tie backs and drilling piles and caissons.
    • There will be two (2) concrete trucks doing four rounds each (8 in total) in and out of the site.
  • Subcontractor, GFL Excavating will be removing material from the site: four (4) dump trucks will take 5 loads each, for a total of 20 loads.

Wednesday, April 18

  • Subcontractor, Deep Foundation, will be installing tie backs and drilling piles and caissons.
    • There will be two (2) concrete trucks doing four rounds each (8 in total) in and out of the site.
  • Subcontractor, GFL Excavating will be removing material from the site: four (4) dump trucks will take 5 loads each, for a total of 20 loads.

Thursday, April 19

  • Subcontractor, Deep Foundation, will be installing tie backs and drilling piles and caissons.
    • There will be two (2) concrete trucks doing four rounds each (8 in total) in and out of the site.
  • Subcontractor, GFL Excavating will be removing material from the site: four (4) dump trucks will take 5 loads each, for a total of 20 loads.

Friday, April 20

  • Subcontractor, Deep Foundation, will be installing tie backs and drilling piles and caissons.
    • There will be two (2) concrete trucks doing four rounds each (8 in total) in and out of the site.
  • Subcontractor, GFL Excavating will be removing material from the site: four (4) dump trucks will take 5 loads each, for a total of 20 loads.

* * *

NOTES:

Paid Duty Police Officer is on-site daily Monday to Friday, from 7:00 am to 4:00 pm daily to assist with traffic control.

Click on the link for a printable PDF of the L Tower and Backstage April 14 – 21 summary highlights: L Tower & Backstage Construction Summary Highlights April 14-21

Backstage – 1 The Esplanade – Construction Schedule Feb 13 – 17

This is the current construction schedule for 1 The Esplanade – L Tower parking and Backstage condominium for February 13 – 17, 2012

Posted February 10, 2012

Monday, February 13

  • Sub-contractor, Deep Foundation drilling caissons and piles.
  • Seven (7) loads of concrete.
  • Sub-contractor, GFL and will have four (4) dump trucks removing material from the site, doing five (5) rounds each.

Tuesday, February 14

  • Sub-contractor, Deep Foundation drilling caissons and piles.
  • Seven (7) loads of concrete.

Wednesday, February 15

  • Sub-contractor, Deep Foundation drilling caissons and piles.
  • Seven (7) loads of concrete.

Thursday, February 16

  • Sub-contractor, Deep Foundation drilling caissons and piles.
  • Seven (7) loads of concrete.

Friday, February 17

  • Sub-contractor, Deep Foundation drilling caissons and piles.
  • Seven (7) loads of concrete.

* * *

NOTES:

A Paid Duty Police Officer is on-site daily Monday to Friday, from 7:00 am to 4:00 pm daily to assist with traffic control.

Backstage – 1 The Esplanade – Construction Schedule Feb 6 – 10

This is the current construction schedule for 1 The Esplanade – L Tower parking and Backstage condominium for February 6 – 10, 2012

Updated February 8, 2012

Monday, February 6

  • Sub-contractor, Deep Foundation drilling caissons and piles.
  • Seven (7) loads of concrete.
  • Sub-contractor, GFL will be delivering a backhoe.
  • Sub-contractor, GFL and will have six (6) dump trucks removing material from the site, doing five (5) rounds each.

Tuesday, February 7

  • Sub-contractor, Deep Foundation drilling caissons and piles.
  • Seven (7) loads of concrete.
  • Sub-contractor, GFL and will have six (6) dump trucks removing material from the site, doing five (5) rounds each.

Wednesday, February 8

  • Sub-contractor, Deep Foundation drilling caissons and piles.
  • Seven (7) loads of concrete.

Thursday, February 9

  • Sub-contractor, Deep Foundation drilling caissons and piles.
  • Seven (7) loads of concrete.
  • UPDATED: Sub-contractor, GFL is scheduled to have 4 dump trucks doing 5 rounds each, removing material from the site. 

Friday, February 10

  • Sub-contractor, Deep Foundation drilling caissons and piles.
  • Seven (7) loads of concrete.
  • UPDATED: Sub-contractor, GFL is scheduled to have 4 dump trucks doing 5 rounds each, removing material from the site. 

* * *

NOTES:

A Paid Duty Police Officer is on-site daily Monday to Friday, from 7:00 am to 4:00 pm daily to assist with traffic control.

Construction Schedule September 26 – October 1, 2011

This is the current construction schedule for 8 The Esplanade – L Tower and 1 The Esplanade – L Tower Parking + Backstage for the week of September 26 – October 1, 2011

Posted: September 30, 2011

Monday, September 26

8 The Esplanade – L Tower

  • There will be a 72M concrete pour, which may go beyond 7:00 pm.

1 The Esplanade – L Tower Parking + Backstage

  • Sub-contractor, Deep Foundation will be drilling caissons and piles.
  • There will be 10 loads of concrete accessing The Esplanade.

Tuesday, September 27

8 The Esplanade – L Tower

  • There will be a 100M concrete pour, which may go beyond 7:00 pm.

1 The Esplanade – L Tower Parking + Backstage

  • Sub-contractor, Deep Foundation will be drilling caissons and piles.
  • There will be 10 loads of concrete accessing The Esplanade.

Wednesday, September 28

8 The Esplanade – L Tower

  • There will be a 72M concrete pour, which may go beyond 7:00 pm.

1 The Esplanade – L Tower Parking + Backstage

  • Sub-contractor, Deep Foundation will be drilling caissons and piles.
  • There will be 10 loads of concrete delivered throughout the day.

Thursday, September 29

8 The Esplanade – L Tower

  • No concrete scheduled.

1 The Esplanade – L Tower Parking + Backstage

  • Sub-contractor, Deep Foundation will be drilling caissons and piles.
  • There will be 10 loads of concrete delivered throughout the day.
Friday, September 30
8 The Esplanade – L Tower
  • No concrete scheduled.

1 The Esplanade – L Tower Parking + Backstage

  • Sub-contractor, Deep Foundation will be drilling caissons and piles.
  • There will be 10 loads of concrete delivered throughout the day.
  • Sub-Contractor Deep Foundation has scheduled an 85-foot steel pile delivery at Noon. 

Saturday, October 1

8 The Esplanade – L Tower

  • Dominus site labour in 9:00 am – 1:00 pm to perform housekeeping duties.
  • Sub-contractor, Premform will work from on the site from 9:00 am – 4:00 pm.

1 The Esplanade – L Tower Parking + Backstage

  • No construction activity is scheduled.
NOTE 1: Several daily deliveries throughout the week with little or no impact on traffic.
NOTE 2. A Paid Duty Police Officer is on-site daily from 7:00 am to 4:00 pm Monday through Friday. A security guard on site from 4:00 pm – 6:00 am daily.
%d bloggers like this: