This a construction update for 1 The Esplanade, Backstage condominium – for November 20 – 21, 2015.

The temporary lighting has been added this past week along the Backstage construction fence line illuminates the walkway on the south of The Esplanade.  Podium work continues over the next few weeks as insulation then the exterior cladding will be installed. Work on the ground floor parking garage is proceeding with work on Saturday and next week. We will post next week’s full schedule on Monday, November 23. 

Temporary lighting along the walkway on the south side of The Esplanade

Temporary lighting along the walkway on the south side of The Esplanade

Podium work has been ongoing through the past week, today and will continue over the next few weeks.

Placing the scaffolding in place required for exterior instalation and cladding work on the Backstage podium

Placing the scaffolding in place required for exterior installation and cladding work on the Backstage podium

Saturday November 21

  • Appliance delivery.
  • Interior suite work: drywall and finishing.
  • Construction housekeeping.
  • Garage insulation installation, painting and floor preparation. 
Installing insualtion in the first floor parking garage at Backstage

Installing insulation in the first floor parking garage at Backstage

The ground floor parking garage level is being worked on today, tomorrow and into next week until it’s complete. We’ll feature updates in our upcoming posts.

Insualtion for the parking garage ceiling at Backstage

Insualtion for the parking garage ceiling at Backstage

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s

%d bloggers like this: