Backstage Construction Schedule August 29 – September 4, 2015

This is the construction schedule for 1 The Esplanade, Backstage condominium – for August 29 – September 4, 2015.

NOTE: Please note that temporary crane work and cladding work continues at Backstage tower Monday, August 31 through Wednesday September 2.

The mobile crane will be active on Monday, August 31, necessitating the closure of the eastbound traffic lane from Yonge Street and the south side pedestrian route. Permit Access Mast 8 days – August 25 – September 2

For the balance of Monday – Wednesday, it is expected that the traffic lane will be open and pedestrians will be able to use the south side walkway. The north sidewalk remains open 24/7 between Scott and Yonge. 

Summary Construction Schedule for August 29 September 4: Backstage & L Tower Construction Summary-Aug-29-Sep-4-2015
 

Backstage August 28, external lift for cladding instalation

Backstage August 28, external lift for cladding installation


Saturday August 29

  • Interior suite work: drywall and finishing.
  • Construction housekeeping
Delivery at Backstage, August 28

Delivery at Backstage, August 28

Monday August 31

  • Interior suite work: drywall and finishing.
  • Mobile crane in use at Yonge and on the west side of Back Stage, traffic lane road closures through the day.

Tuesday September 1

  • Interior suite work: drywall and finishing.
  • Drywall delivery 12 pm to 4 pm

Wednesday September 2

  • Interior suite work: drywall and finishing.
  • 23rd floor kitchen delivery 8 am to 11 am
  • Drywall delivery 12 pm to 4 pm

Thursday September 3

  • Interior suite work: drywall and finishing.

Friday September 4

  • Interior suite work: drywall and finishing.
  • HVAC material delivery in the morning after 7:00 am.
  • Carpentry delivery in the morning after 7:00 am.
Looking south from Backstage

Looking south from Backstage

 

L Tower August 29 – September 4 2015

8 The Esplanade – L Tower Saturday, August 29 – September 4, 2015.

The L Tower makes an iconic gateway marker to the St. Lawrence Market Neighbourhood. New streetscapes are being enjoyed by local residents and visitors. While more exterior finishing remains they are close to their final state. Inside the L Tower units are being completed weekly, as new residents continue to move-in via Yonge Street. The Tower Crane remains up through September, we will be updating this site when plans for its take down are finalized. 

Yonge & The Esplanade NE corner looking to the CN Tower

Yonge & The Esplanade NE corner looking to the CN Tower

L Tower as glimpsed from its southern neighbour across The Esplanade: 

L Tower and Tower Crane as seen from Backstage

L Tower and Tower Crane as seen from Backstage

The emerging streetscape on Yonge Street: 

L Tower looking north on Yonge Street, August 28

L Tower looking north on Yonge Street, August 28

  

Backstage update August 24

UPDATE August 24, 2015

The partial road closure was off to a successful start this Monday morning. While the eastbound traffic lane from Yonge Street east to the Toronto Parking Authority garage entrance and exit was closed, pedestrian access to Yonge Street was unimpeded along the north sidewalk beside the L Tower and the Sony Centre. 

The City of Toronto permits (see links below) for the road closure allow the eastbound traffic lane to be closed from 7:00 am to 7:00 pm daily on weekdays through September 2, every effort will be made to re-open the traffic lane prior to rush hour when feasible. 

Please click here for the full construction schedule through Friday, August 28. 

Partial road closure August 24 - Backstage on The Esplanade

Partial road closure August 24 – Backstage on The Esplanade

You may view or download the Road Closure permits by clicking on the links below:

Permit Access Mast – August 24

Permit Access Mast 8 days – August 25 – September 2

Eastbound traffic lane closed August 24 to permit mobile crane work at Backstage on The Esplanade

Eastbound traffic lane closed August 24 to permit mobile crane work at Backstage on The Esplanade

Mobile crane at Backstage, partial road closure, open north sidewalk on The Esplanade to Younge Street

Mobile crane at Backstage, partial road closure, open north sidewalk on The Esplanade to Yonge Street.

 

Backstage Construction Schedule August 22 – 28, 2015

This the construction schedule for 1 The Esplanade, Backstage condominium – for August 22 – 28, 2015.

NOTE: Please note that temporary crane work and cladding work on the Backstage tower will be occurring from Monday, August 24 through Wednesday September 2.

The road closure will occur only on weekdays and will affect the eastbound traffic lane between Yonge Street and the east entrance to the Toronto Parking Authority garage and the south side pedestrian walkway.

Pedestrians will have full use of the north sidewalk on The Esplanade from Scott Street to Yonge Street.
Monday August 24 is expected to be a full day closure from 7 am to as late as 7 pm. The balance of the time from August 25 through September 2 it is expected the eastbound traffic lane will be open for the afternoon rush hour.

Road closure permits for August 24 and August 25 – September 2: Permit Access Mast – August 24 Permit Access Mast 8 days – August 25 – September 2
 

Site of August 25 crane installation and road closure on The Esplanade at Yonge.

Site of August 25 crane installation and road closure on The Esplanade at Yonge.


Saturday August 22

  • Interior suite finishing
  • Construction housekeeping
Kitchen installation underway at Backstage

Kitchen installation underway at Backstage

Monday August 24

  • Interior suite finishing
  • Window delivery for 2nd to 4th floor
  • Mobile crane setup at Yonge and Esplanade to erect mast climbing scaffold on west side of Back Stage.

Tuesday August 25

  • Interior suite finishing
  • Drywall delivery 12 pm to 4 pm
  • Mobile crane setup at Yonge and Esplanade to erect mast climbing scaffold on west side of Back Stage.

Wednesday August 26

  • Interior suite finishing
  • 23rd floor kitchen delivery 8 am to 11 am
  • Drywall delivery 12 pm to 4 pm
  • Mobile crane setup at Yonge and Esplanade to erect mast climbing scaffold on west side of Back Stage.

Thursday August 27

  • Interior suite finishing
  • Mobile crane setup at Yonge and Esplanade to erect mast climbing scaffold on west side of Back Stage.

Friday August 28

  • Interior suite finishing
  • Ventilation material delivery in AM
  • Carpentry delivery in AM
  • Mobile crane setup at Yonge and Esplanade to erect mast climbing scaffold on west side of Back Stage.
Looking west from the 10th floor of Backstage -- also the location of the temporary crane installation August 25 - September 2.

Looking west from the 10th floor of Backstage — also the location of the temporary crane installation August 25 – September 2.

 

L Tower August 22 – 28 2015

8 The Esplanade – L Tower Saturday, August 22 – 28, 2015.

The completed sidewalk on the north side of The Esplanade will provide the pedestrian access between Scott Street and Yonge next week as the eastbound traffic lane and the south side sidewalk are closed August 25 – September 2 (weekdays only) to permit crane and cladding work on the Backstage tower next door. 

Inside the L Tower units are being completed every day as new residents continue to move-in. The Tower Crane remains up through summer.

The Esplanade north sidewalk Yonge Street to Scott Street

The Esplanade north sidewalk Yonge Street to Scott Street

 

L Tower Yonge and The Esplanade: 

L Tower Yonge & The Esplanade August 21, 2015

L Tower Yonge & The Esplanade August 21, 2015

Remaining exterior construction elements:

Elements of remaining exterior construction work at L Tower

Elements of remaining exterior construction work at L Tower

Backstage Construction Schedule August 15 – 21, 2015

This the construction schedule for 1 The Esplanade, Backstage condominium – for August 15 – 21, 2015.

NOTE: Another quiet week as suite finishing and interior work on the Backstage tower predominate. Material deliveries occur throughout the week but minimal impact on pedestrian and vehicle traffic is expected.  

Click on the link for a downloadable PDF August 15 – 21 Construction Summary: Backstage & L Tower Construction Summary-Aug-15-21-2015

Backstage podium deck looking east, August 14

Backstage podium deck looking east, August 14

Saturday, August 15

  • Interior suite finishing all day.
  • Housekeeping work on-site.
Looking SW from Backstage, August 14

Looking SW from Backstage, August 14

Monday, August 17

  • Interior suite finishing all day.

Tuesday, August 18

  • Interior suite finishing all day. 
  • Drywall delivery from 12:00 pm to 4:00 pm.

Wednesday, August 19

  • Interior suite finishing all day.
  • Kitchen deliveries for interior suites from 8:00 am to 11:00 am.
  • Steel stud deliveries from Noon to 3:00 pm. 

Thursday, August 20

  • Interior suite finishing all day.
  • No scheduled deliveries. 

Friday, August 21

  • Interior suite finishing all day.
  • HVAC and carpentry materials deliveries in the morning.  
Ready for drywall, Backstage construction interior, August 14

Ready for drywall, Backstage construction interior, August 14

 NOTES:

    • There may be some short-term impacts on pedestrian and vehicular traffic flow as delivery trucks are moved into and out of position.

L Tower August 15 – 21 2015

8 The Esplanade – L Tower Saturday, August 15 – 21, 2015.

The L Tower is fitting into its surroundings while defining them. New streetscapes are emerging, while these are not completely finished they are close to their final state. Inside the L Tower units are being complete every day as new residents continue to move-in. The Tower Crane remains up through summer.

Yonge & The Esplanade at L Tower August 14

Yonge & The Esplanade at L Tower August 14

L Tower and its neighbours, looking up from the The Esplanade: 

L Tower, Backstage, 25 The Esplanade, August 14

L Tower, Backstage, 25 The Esplanade, August 14

The emerging streetscape on The Esplanade:  

L Tower on The Esplanade, August 14

L Tower on The Esplanade, August 14

Backstage Construction Schedule August 10 – 14, 2015

This the construction schedule for 1 The Esplanade, Backstage condominium – for August 10 – 14, 2015.

NOTE: We have incomplete information from the construction managers. When we have more complete information we will post it here. Please check back for updates.  

Backstage with L Tower

Backstage with L Tower

Monday, August 10

  • Interior suite finishing all day.
  • Other scheduled construction work unknown at post time.

Tuesday, August 11

  • Interior suite finishing all day. 
  • Other scheduled construction work unknown at post time.

Wednesday, August 12

  • Interior suite finishing all day.
  • Other scheduled construction work unknown at post time.

Thursday, August 13

  • Interior suite finishing all day.
  • Other scheduled construction work unknown at post time. 

Friday, August 14

  • Interior suite finishing all day.
  • Other scheduled construction work unknown at post time. 
Backstage construction interior

Backstage construction interior

 NOTES:

    • There may be some short-term impacts on pedestrian and vehicular traffic flow as delivery trucks are moved into and out of position.

L Tower August 8 – 14 2015

8 The Esplanade – L Tower Saturday, August 8 – 14, 2015.

We take a look back four years just to show the contrast of the L Tower site from a few floors above grade then to its full height today.

Interior work on suite finishes continues; as do regular move-ins of new residents.The Yonge Street Esplanade sidewalks are substantially complete. The Tower Crane remains up through summer. We look forward to work on the Sony Centre west plaza getting underway in the fall. Just a reminder that work on Scott Street is part of the City of Toronto’s work to enhance the wast and north sides of the Sony Centre for the Performing Arts. 

L Tower 2011 - 2015

L Tower 2011 – 2015

How it looked in 2011: 

SAMSUNG

L Tower seen from the Backstage construction site in 2011 

How it looks now:  

L Tower & Backstage from the Gardiner Expressway

L Tower & Backstage from the Gardiner Expressway 2015

Backstage Construction Schedule August 8 update

This is the construction schedule for 1 The Esplanade, Backstage condominium – for Saturday August 8, 2015.

We take a look back at the Backstage site in 2011 and the contrast to today. Please note that the construction schedule for August 10 – 14 will be posted by or before 7:00 am on Monday, August 10. 

Backstage 2011 – 2015

Backstage 2011 - 2015

Backstage 2011 – 2015

Saturday, August 8

  • Interior suite work: drywall and finishing.
  • On-site housekeeping.

Please check back for next week’s construction and delivery schedule. Have a great weekend. 