8 The Esplanade – L Tower Saturday, Monday, January 5, 2015 – Friday, January 9
Interior work on the site is ongoing. As the L Tower is partially occupied, there will be people coming and going to their homes and the valet parking service for L Tower residents will be ongoing.
Click on the link for a downloadable PDF Construction Summary: Backstage & L Tower Construction Summary-Jan-5-9-2015
- Interior work continues on multiple floors.
- Move-ins are ongoing through the Yonge Street entrance.
- Sidewalk work on Yonge Street is ongoing, weather permitting. The revised update is that sidewalk work will be completed in January at the corner of The Esplanade and Yonge.
- The Large Crane Tower is currently scheduled to remain in place over the winter and will be removed in March, 2015.