Backstage Construction Schedule December 13 – 19

This is the current construction schedule for 1 The Esplanade – L Tower parking and Backstage condominium – for December 13 – 19, 2014.

Backstage crash wall adjacent the rail corridor

Backstage crash wall adjacent the rail corridor

Saturday, December 13

  • Raising the tower crane, from 9:00 am.
  • Window delivery which will occupy the south lane of The Esplanade, from 11:00 am.

Monday, December 15

  • Rebar delivery, scheduled to begin at 7:00 am.
  • 31stFloor slab concrete pour #3, by subcontractor Italform, scheduled to begin at 11:00 am.
  • After slab, wall & column concrete pour (45 metres of concrete). 
  • Concrete Finishing until to 11:00 pm.

Tuesday, December 16

  • A wall and column concrete pour, by subcontractor Italform (43 metres of concrete), scheduled to run from 12:30 pm.

Wednesday, December 17

  • Rebar delivery, scheduled to begin at 7:00 am.
  • 32ndFloor slab concrete pour #1, by subcontractor Italform, scheduled to begin at 11:30 am.
  • After slab, wall & column pour (33 metres of concrete). 
  • Concrete Finishing until to 11:00 pm.

ThursdayDecember 18

  • Rebar delivery, scheduled to begin at 7:00 am.
  • 32ndFloor slab concrete pour #2, by subcontractor Italform, scheduled to begin at 11:00 am.
  • An after-slab wall and column concrete pour (33 metres of concrete) to begin following the main slab pour.
  • Concrete Finishing until to 11:00 pm.

Friday, December 19

  • Rebar delivery, scheduled to begin at 7:00 am.
  • 32nd Floor slab concrete pour #3, by subcontractor Italform, scheduled to begin at 11:00 am.
  • An after-slab wall and column concrete pour (33 metres of concrete) to begin following the main slab pour.
  • Concrete Finishing until to 11:00 pm.
Future Public Exhibit Space on the 2nd floor of Backstage

Future Public Exhibit Space on the 2nd floor of Backstage

 NOTES:

  • Paid Duty Police Officer is on-site daily, when available, Monday to Friday, from 7:00 am to 4:00 pm daily to assist with traffic control.
  • Concrete pour schedules and times are subject to weather conditions.
  • There may be some short-term impacts on traffic flow as concrete trucks are moved into position.
  • Concrete trucks must keep their engines running during the pouring process.

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Twitter picture

You are commenting using your Twitter account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s

%d bloggers like this: