This is the current construction schedule for 8 The Esplanade – L Tower November 8 – 14, 2014
Please note: that there will be a road closure of The Esplanade from Yonge Street to Scott Street from 9:00 am to 7:00 pm Monday, November 10 and Tuesday November 12. We have provided a copy of the ROAD CLOSURE PERMIT for November 10 – 11: SBACKSTAGE 14110715270. Pedestrian access will be provided as safety permits on the north side The Esplanade adjacent the L Tower.
- Please click the link to the right for a downloadable PDF Construction Summary:
Saturday, November 8
- Interior work on site.
- Move-ins through the Yonge Street entrance.
Monday, November 10
- There will be general construction work inside the L Tower.
- Move-ins continue through the Yonge Street entrance.
Tuesday, November 11
- There will be general construction work inside the L Tower.
- Move-ins continue through the Yonge Street entrance.
Wednesday, November 12
- There will be general construction work inside the L Tower.
- Move-ins continue through the Yonge Street entrance.
Thursday, November 13
- There will be general construction work inside the L Tower.
- Move-ins continue through the Yonge Street entrance.
Friday, November 14
- There will be general construction work inside the L Tower.
- Move-ins continue through the Yonge Street entrance.
NOTE: New residents are continuing to move into the L Tower When moves occur they are loading in on Yonge Street. As external construction comes closer to completion, the dimensions of the future sidewalk area on Yonge Street is emerging.