Update for Backstage Thursday August 14
August 13, 2014 Leave a comment
Thursday, August 14 – UPDATED
- A 13th floor wall and column concrete pour, by subcontractor Italform (45 metres of concrete), scheduled to run from 1:00 pm.
- Toro Aluminum will be delivering a tractor trailer load of windows at 3:00 pm. The tractor trailer will be occupying the south curb lane of The Esplanade during unloading.
- NOTE: Eastbound traffic from Yonge Street will be impacted temporarily. Pedestrians will be able to have access through the site during unloading. We apologize any inconvenience this may cause.