L Tower Construction Schedule December 30 – January 3, 2014

This is the current construction schedule for 8 The Esplanade – L Tower –  December 30, 2013 – January 3, 2014

Posted December 32014-free-greeting-card-photo-10

Monday, December 30

  • There will be general construction work inside the L Tower.

Tuesday, December 31

  • There will be general construction work inside the L Tower in the early part of the day.

HAPPY NEW YEAR – January 1, 2014

New Year’s Day

  • Site closed for the holiday.

Thursday, January 2

  • Some deliveries to the hoist and interior work.

Friday, December 20

  • Some deliveries to the hoist and interior work.

Please note:

  • There may be some short-term disruptions to vehicular traffic while delivery trucks are moved into position and unloaded.
  • A Paid Duty Police Officer is on-site Thursday & Friday this week, from 7:00 am to 4:00 pm daily to assist with traffic control.


Ice Clearing today at the L Tower

Please be advised that the site crew at the L Tower had to come into work today to clear ice that otherwise could have posed a danger to the site crew, pedestrians and vehicles. Every effort has been and is continuing to be made to ensure this is done safely.

 As an “act of god” some ice appears to have gone accidentally astray during the deicing process. We have been advised that some ice may have accidentally broken a window at 25 The Esplanade. Dominus Construction staff have been in touch with the Property Manager at 25 The Esplanade and have offered to cover the cost of any repairs that may be required.
Again the efforts to clear ice from the L Tower site were absolutely necessary to ensure staff and public safety. Continuing efforts are underway to ensure the safe removal of the remaining ice.

Backstage Construction Schedule – December 23 – 27

This is the current construction schedule for 1 The Esplanade – L Tower parking and Backstage condominium for   December 23 – 27, 2013

Please click here for general information on concrete pours.

Posted December 20

Monday, December 23

  • Second floor slab pour, by subcontractor Italform. The pour is scheduled to begin at 9:00 am.
  • After slab, 50 cubic metre wall and column concrete pour by subcontractor Italform. This pour is scheduled to begin after the slab pour is completed. 
  • Concrete finishing, scheduled to proceed until 9:00 PM.

Tuesday, December 17

  • There will be some minimal construction activity on site during the day.

HAPPY HOLIDAYSchristmas-tree-pics-0111

Christmas Day

  • Site closed for the holiday. 

Boxing Day

  • Site closed for the holiday.

Friday, December 27

  • Site closed.

NOTES:

  • Paid Duty Police Officer is on-site daily Monday to Tuesday this week, from 7:00 am to 4:00 pm daily to assist with traffic control.
  • Concrete pour schedules and times are subject to weather conditions.
  • There may be some short-term impacts on traffic flow as concrete trucks are moved into position.
  • Concrete trucks must keep their engines running during the pouring process.

Please click on the link to download a construction summary: Backstage & L Tower Construction Summary-Dec-23-27-2013


L Tower Construction Schedule December 23 – 27

This is the current construction schedule for 8 The Esplanade – L Tower –  December 23 – 27, 2013

Posted December 20

Monday, December 23

  • There will be deliveries to the hoist throughout the day from 7:00 am.
  • There will be general construction work inside the L Tower.

Tuesday, December 24

  • There will be deliveries to the hoist throughout the day from 7:00 am finishing early in the day.
  • There will be general construction work inside the L Tower in the early part of the day.

HAPPY HOLIDAYSchristmas-tree-pics-0111

Christmas Day

  • Site closed for the holiday.

Boxing Day

  • Site closed for the holiday.

Friday, December 20

  • Site closed.

Please note:

  • There may be some short-term disruptions to vehicular traffic while delivery trucks are moved into position and unloaded.
  • A Paid Duty Police Officer is on-site Monday & Tuesday this week, from 7:00 am to 4:00 pm daily to assist with traffic control.

Please click on the link to download a construction summary: Backstage & L Tower Construction Summary-Dec-23-27-2013

Backstage Construction Schedule – December 14 – 20

This is the current construction schedule for 1 The Esplanade – L Tower parking and Backstage condominium for   December 14 – 20, 2013

20131128_101104

Please click here for general information on concrete pours.

Posted December 13

Saturday, December 14

  • Air compressors & concrete breakers will be in use on the south edge of the site. The work is scheduled to begin at 9:00 am and should be completed by 2:oo pm.

Monday, December 16

  • There will be a rebar delivery at 7:00 am. 
  • 50 cubic metre, wall and column concrete pour by subcontractor Italfor. The pour is scheduled to begin at 12:30 pm and should be completed before 7:00 pm.

Tuesday, December 17

  • 50 cubic metre, wall and column concrete pour by subcontractor Italfor. The pour is scheduled to begin at 12:30 pm and should be completed before 7:00 pm.

Wednesday, December 18

  • There will be a rebar delivery at 7:00 am. 
  • 50 cubic metre, wall and column concrete pour by subcontractor Italfor. The pour is scheduled to begin at 12:30 pm and should be completed before 7:00 pm.

Thursday, December 19

  • Second floor slab pour # 8, part 1, by subcontractor Italform. The pour is scheduled to begin at 10:00 am.
  • After slab, 50 cubic metre wall and column concrete pour by subcontractor Italform. This pour is scheduled to begin after the slab pour is completed. 
  • Concrete finishing, scheduled to proceed until 10:00 PM.

Friday, December 20

  • Second floor slab pour #8, part 2, by subcontractor Italform. The pour is scheduled to begin at 10:00 am.
  • After slab, 50 cubic metre wall and column concrete pour by subcontractor Italform. This pour is scheduled to begin after the slab pour is completed. 
  • Concrete finishing, scheduled to proceed until 10:00 PM.

NOTES:

  • Paid Duty Police Officer is on-site daily Monday to Friday, from 7:00 am to 4:00 pm daily to assist with traffic control.
  • Concrete pour schedules and times are subject to weather conditions.
  • There may be some short-term impacts on traffic flow as concrete trucks are moved into position.
  • Concrete trucks must keep their engines running during the pouring process.

Please click on the link to download a construction summary: Backstage & L Tower Construction Summary-Dec 14-20-2013


L Tower Construction Schedule December 16 – 20

This is the current construction schedule for 8 The Esplanade – L Tower –  December 16 – 20, 201320131128_101011-1

Posted December 13

Monday, December 16

  • There will be deliveries to the hoist throughout the day from 7:00 am.
  • There will be general construction work inside the L Tower.

Tuesday, December 17

  • There will be deliveries to the hoist throughout the day from 7:00 am.
  • There will be general construction work inside the L Tower.

Wednesday, December 18

  • There will be deliveries to the hoist throughout the day from 7:00 am.
  • There will be general construction work inside the L Tower.

Thursday, December 19

  • There will be deliveries to the hoist throughout the day from 7:00 am.
  • There will be general construction work inside the L Tower.

Friday, December 20

  • There will be deliveries to the hoist throughout the day from 7:00 am.
  • There will be general construction work inside the L Tower.

Please note:

  • There may be some short-term disruptions to vehicular traffic while delivery trucks are moved into position and unloaded.
  • A Paid Duty Police Officer is on-site daily Monday to Friday, from 7:00 am to 4:00 pm daily to assist with traffic control.

Please click on the link to download a construction summary: Backstage & L Tower Construction Summary-Dec 14-20-2013

Backstage Construction Schedule – December 7 – 13

This is the current construction schedule for 1 The Esplanade – L Tower parking and Backstage condominium for   December 7 – 13, 201320131128_101146

Please click here for general information on concrete pours.

Posted December 6

Saturday, December 7

  • Labourers will be on-site chipping concrete . The work is scheduled to begin at 9:00 am and should be completed by midday.

Monday, December 9

  • There will be a rebar delivery at 10:00 am. 
  • Second floor slab pour, by subcontractor Italform. The pour is scheduled to begin after 10:00 am.
  • After slab, 50 cubic metre wall and column concrete pour by subcontractor Italform. This pour is scheduled to begin after the slab pour is completed. 
  • Concrete finishing, scheduled to proceed until 8:00 PM.

Tuesday, December 10

  • There will be a rebar delivery at 7:00 am. 
  • Second floor slab pour, by subcontractor Italform. The pour is scheduled to begin at 10:00 am.
  • After slab, 50 cubic metre wall and column concrete pour by subcontractor Italform. This pour is scheduled to begin after the slab pour is completed. 
  • Concrete finishing, scheduled to proceed until 8:00 PM.

Wednesday, December 11

  • 50 cubic metre, wall and column concrete pour by subcontractor Italfor. The pour is scheduled to begin at 12:00 pm and should be completed before 7:00 pm.

Thursday, December 12

  • Second floor slab pour, by subcontractor Italform. The pour is scheduled to begin at 10:00 am.
  • After slab, 50 cubic metre wall and column concrete pour by subcontractor Italform. This pour is scheduled to begin after the slab pour is completed. 
  • Concrete finishing, scheduled to proceed until 8:00 PM.

Friday, December 13

  • There will be a rebar delivery at 7:00 am. 
  • 50 cubic metre, wall and column concrete pour by subcontractor Italfor. The pour is scheduled to begin at 12:00 pm and should be completed before 7:00 pm.

NOTES:

  • Paid Duty Police Officer is on-site daily Monday to Friday, from 7:00 am to 4:00 pm daily to assist with traffic control.
  • Concrete pour schedules and times are subject to weather conditions.
  • There may be some short-term impacts on traffic flow as concrete trucks are moved into position.
  • Concrete trucks must keep their engines running during the pouring process.

Please click on the link to download a construction summary: Backstage & L Tower Construction Summary-Dec 7-13-2013


L Tower Construction Schedule December 9 – 13

This is the current construction schedule for 8 The Esplanade – L Tower –  December 9 – 13, 2013

Posted December 6
20131128_100953

Monday, December 9

  • There will be deliveries to the hoist throughout the day from 7:00 am.
  • There will be general construction work inside the L Tower.

Tuesday, December 10

  • There will be deliveries to the hoist throughout the day from 7:00 am.
  • There will be general construction work inside the L Tower.

Wednesday, December 11

  • There will be deliveries to the hoist throughout the day from 7:00 am.
  • There will be general construction work inside the L Tower.

Thursday, December 12

  • There will be deliveries to the hoist throughout the day from 7:00 am.
  • There will be general construction work inside the L Tower.

Friday, December 13

  • There will be deliveries to the hoist throughout the day from 7:00 am.
  • There will be general construction work inside the L Tower.

Please note:

  • There may be some short-term disruptions to vehicular traffic while delivery trucks are moved into position and unloaded.
  • A Paid Duty Police Officer is on-site daily Monday to Friday, from 7:00 am to 4:00 pm daily to assist with traffic control.

Please click on the link to download a construction summary: Backstage & L Tower Construction Summary-Dec 7-13-2013

%d bloggers like this: