L Tower Construction Schedule November 25 – 29
November 22, 2013 Leave a comment

One of L Tower’s 2-storey penthouses, image by Jack Landau from Urban Toronto – http://urbantoronto.ca
This is the current construction schedule for 8 The Esplanade – L Tower – November 25 – 29, 2013
Posted November 22
Monday, November 25
- There will be deliveries to the hoist throughout the day from 7:00 am.
- There will be general construction work inside the L Tower.
Tuesday, November 26
- There will be deliveries to the hoist throughout the day from 7:00 am.
- There will be general construction work inside the L Tower.
Wednesday, November 27
- There will be deliveries to the hoist throughout the day from 7:00 am.
- There will be general construction work inside the L Tower.
Thursday, November 28
- There will be deliveries to the hoist throughout the day from 7:00 am.
- There will be general construction work inside the L Tower.
Friday, November 29
- There will be deliveries to the hoist throughout the day from 7:00 am.
- There will be general construction work inside the L Tower.
Please note:
- There may be some short-term disruptions to vehicular traffic while delivery trucks are moved into position and unloaded.
- A Paid Duty Police Officer is on-site daily Monday to Friday, from 7:00 am to 4:00 pm daily to assist with traffic control.
Please click on the link to download a construction summary: Backstage & L Tower Construction Summary Nov 25-29–2013