L Tower Construction Schedule September 8 – 14
September 7, 2012 Leave a comment
This is the current construction schedule for 8 The Esplanade – L Tower – for September 8 – 14, 2012
UPDATED September 12, 2012
Saturday, September 8
- A delivery of 4 containers of window curtain wall, to arrive after 9:00 am.
Monday, September 10
- A delivery of drywall studs starting at 8:00 am.
- A rebar (steel) delivery starting at 10:00 am.
- Please note:
- There will be short-term disruptions to vehicular traffic while the steel delivery truck is being unloaded.
- To ensure public safety pedestrian and cycling traffic may also be disrupted briefly during crane lifts and swings.
- A 92M (cubic metre) part two (2), wall and column concrete pour, levels 58 – 59, starting at 1:00 pm, which is not expected to extend beyond 7:00 pm.
Tuesday, September 11
- A rebar (steel) delivery starting at 12:30 pm.
- Please note:
- There will be short-term disruptions to vehicular traffic while the steel delivery truck is being unloaded.
- To ensure public safety pedestrian and cycling traffic may also be disrupted briefly during crane lifts and swings.
Wednesday, September 12
- A rebar (steel) delivery starting at 10:00 am.
- Please note:
- There will be short-term disruptions to vehicular traffic while the steel delivery truck is being unloaded.
- To ensure public safety pedestrian and cycling traffic may also be disrupted briefly during crane lifts and swings.
Thursday, September 13
- There will be a 12M (cubic metre) concrete pour starting at 2:00 pm, which is expected to be finished prior to 7:00 pm.
Friday, September 14
- There will be a rebar (steel) delivery starting at 7:00 am.
- A second rebar (steel) delivery will commence at at 12:30 pm.
- Please note:
- There will be short-term disruptions to vehicular traffic while the steel delivery truck is being unloaded.
- To ensure public safety pedestrian and cycling traffic may also be disrupted briefly during crane lifts and swings.
- A delivery of a pressurization fan, starting at 9:00 am.
NOTES:
A Paid Duty Police Officer is on-site daily Monday to Friday, from 7:00 am to 4:00 pm daily to assist with traffic control.
Please click here for a downloadable construction summary: L Tower & Backstage Construction September 8-14