L Tower & Backstage Updates for Friday July 27
July 26, 2012 Leave a comment
These are the revised L Tower and Backstage Schedules for Friday, July 27
NOTE: There will be dump trucks, rebar deliveries and concrete trucks arriving and departing, as Thursday’s scheduled concrete pour and deliveries were cancelled due weather conditions. Thanks to the Sony Centre, trucks will have access to the Centre’s Front Street lay-by as a staging area, which will help to ease congestion on Scott Street and the Esplanade.
Friday, July 27 – REVISED
Backstage – click here to see revised original post for July 21 – 27:
- Tunnel Boring Machine testing.
- Subcontractor, GFL Excavating will be removing material from the site: six (6) dump trucks will take 12 -13 loads each, for a total of seventy-two to seventy-four (72 – 74) loads.
L Tower – click here to the see revised original post for July 21 – 27:
- A rebar (steel) delivery starting at 7:00 am.
- A 92M (cubic metre) part 2, wall and column concrete pour, levels 52 – 53, starting at 12:00 pm, which is not expected to extend beyond 7:00 pm.
- A second rebar (steel) delivery starting at 12:30 pm.