Tunnel Boring Machine backing into position
July 25, 2012 Leave a comment
The Tunnel Boring Machine backing into position at the Backstage site at 1 The Esplanade.
Weekly construction updates for the L Tower at 8 The Esplanade and the Backstage at 1 The Esplanade
July 25, 2012 by EN Consulting Group Leave a comment
The Tunnel Boring Machine backing into position at the Backstage site at 1 The Esplanade.
Filed under Construction Photos, Construction Update