L Tower – 8 The Esplanade – Saturday March 3 – Crane Raising and Concrete Pour
March 2, 2012 1 Comment
UPDATE for Saturday, March 3, 8 The Esplanade – L Tower – for February 27 – March 3, 2012
Updated March 3, 2012
NOTE: Bad weather this past week delayed the pouring of the concrete slab at Level 29, so significant Saturday work is required; as is permitted by the City of Toronto by-law.
Saturday, March 3
- The crane will be raised beginning at 9:00 am but is dependent on weather. For example, if there is significant wind the crane raising may be delayed or re-scheduled.
-
Concrete pour CANCELLED due to high winds.
- A 220M concrete pour for the slab at Level 29 beginning at 9:00 am, which is not expected to extend beyond 7:00 pm.
- A Paid Duty Officer will be in attendance.
Pingback: Construction Schedule – L Tower – Feb 27 – Mar 3 « L Tower & Backstage Construction Information