Drilling and “breaking” for Backstage

These pictures show site work today–1/9/12–at 1 The Esplanade, preparing the way for the Backstage Condominium from Castlepoint, Cityzen and Fernbrook Homes. The site will also house the underground parking for the adjacent L Tower. The work this week is focused on drilling caissons and “breaking” parts of the railway bridge structure that will be replaced by the Backstage podium. During construction work there are also some temporary holds on eastbound traffic but with every effort made to minimize delays.

Between Backstage and L Tower, temporarily holding traffic on The Esplanade, 1/9/12

"Breaking" a section of railway bridge with a pneumatic hammer, 1 The Esplanade, 1/9/12

Drilling at the Backstage construction site, 1 The Esplanade, 1/9/12

Backstage construction site looking west, 1 The Esplanade, 1/9/12

A "found" metal "flower" at the Backstage construction site, 1 The Esplanade, 1/9/12

Backstage construction site, looking east, 1 The Esplanade, 1/9/12

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s

%d bloggers like this: