Spring 2011 Update

In this post:

1)    Current and upcoming construction

2)    Notes on noise and construction hours

3)    Map Link

4)    Contact us

Current and upcoming construction

Main Activity

Details

Timeframe

Tower construction
  • Crane operations
  • Hoist operations,
  • Framing,
  • Concrete pouring
Ongoing – 1 floor every 4 to 5 days
Garage Site Preparation
  • Caisson drilling,
  • Soil removal,
  • Tiebacks,
  • Reinforcement of the embankment
  • Laying pipe and steel.
Early April to November 2011.
Deliveries & Removals
  • Materials and supplies to support constriction
  • Temporary closures to Scott/The Esplanade intersection
  • Temporary closures of eastbound traffic on The Esplanade
Ongoing
Sony Centre Mechanical
  • Scaffolding to be installed on the southeast side of the Sony Centre at Scott Street and The Esplanade
  • Cladding the mechanical  structures.
April through June 2011

Notes on noise and construction hours:

  • All construction activities will be carried out according City of Toronto by-laws and in particular the Toronto Municipal Code Chapter 591, Noise, respecting construction noise.
    • Monday to Friday 7 a.m. to 7 p.m.
    • Saturday 9 a.m. to 7 p.m.
    • These time restrictions do not apply to the continuous pouring of concrete or large crane work, however every effort will be made to work with these standard hours.
  • Caisson drilling activities will produce some noise and vibration during construction hours.
  • Deliveries and removals will entail some noise from truck engines, loading and unloading, and reverse indicators.

Map Link:

Please click here for a link to a city map of the site.

Contact us

If you have any questions or queries please click here to contact us.

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s

%d bloggers like this: