Esplanade re-opened between Scott & Yonge

February 28, 2013  5:00 pm

The ice has stopped falling from the forming, crane and building edge at the L Tower.

The roadway has been re-opened.

Security staff will keep an eye on the situation. All the same please exercise caution traversing the roadway on The Esplanade between Scott Street and Yonge Street. 

Many thanks for your patience and understanding.

Esplanade Road Closure Update: Open Sept 20. Closed Sept 21 and 24

The Esplanade between Scott Street and Yonge Street was open today, September 19 and will be open tomorrow September 20. It will be closed again on Friday, September 21 and Monday September 24.

The cause of this change as noted in a previous post (here), were the transportation and wide-load delivery challenges for the steel lining that was to be installed, starting on Tuesday, September 18. Initial preparations were done on Tuesday with the mobile crane. However, without the steel lining no further work could be done.

Mobile Crane on The Esplanade, September 18/12

This delay and rescheduling has been caused by factors beyond the control of the construction management team. They apologize again for the inconvenience these changes may cause.


The revised plan will not exceed the original number of permitted road closure days and stays within the permitted hours – 7 am – 6 am.

UPDATE as of September 19, 2012

Road Closure: The Esplanade between Scott Street and Yonge Street:

  • Thursday, September 20 – OPEN
  • Friday, September 21, CLOSED 7 am – 6 pm
  • Monday, September 24, CLOSED 7 am – 6 pm

Wide-load Deliveries under police escort 

  • Friday, September 21 – after 10 am.
  • Monday, September 25 – after 10 am

    Please click on this link for a downloadable PDF version of this post: Esplanade Road Closure Update

Tunnel boring equipment loading on The Esplanade.

image

July 23, 2012 The Esplanade Road has been closed between Scott Street and Yonge Street since July 16 to permit the safe construction of and underground tunnel between the L Tower’s parking, located beneath the site of the Backstage condo, and the L Tower itself. Prepatory work to dig out the opening for the tunnel boring machine was conducted last week. Today, equipment to support the tunnel boring machine is being brought into place.

Photo of the Day: Yonge Street Set For Change | Urban Toronto

A view of the L Tower looking north up Yonge Street from our friends at Urban Toronto: Photo of the Day: Yonge Street Set For Change | Urban Toronto.

L Tower Construction Photos, March 16, 2012

L Tower at 30 floors and counting - as seen from the Backstage construction site - March 16, 2012

Site of the future public plaza at the Sony Centre, L Tower in the background, March 16, 2012

L Tower rising above the future public plaza beside the Sony Centre, March 16, 2012

Looking up at the L Tower from Yonge Street, March 16, 2012

L Tower as seen from Union Station - Front Street West, March 16, 2012

L Tower from Yonge and King

L Tower from Yonge & King, February 16, 2012

L Tower 24 floors and counting

image

The L Tower rising over Yonge Street as seen from the GO Transit Bus Station. February 2, 2012

8 The Esplanade – Construction Schedule December 19 – 23

This is the current construction schedule for 8 The Esplanade – L Tower for the week of December 19 – 23, 2011

Posted December 20, 2011

Monday, December 19

  • There will be a steel Delivery at 7:00 am.
  • Concrete Pour Cancelled due to inclement weather.

Tuesday, December 20

  • There will be a steel delivery at 7:00 am.
  • There will be an 90M concrete pour beginning at 2:00pm with the chance of extending beyond 7:00 pm.

Wednesday, December 21

  • There will be a steel delivery at 7:00 am.
  • RESCHEDULED: There will be an 70M concrete pour beginning at 1:00pm with the chance of extending beyond 7:00 pm.

Thursday, December 22

  • There will be a steel delivery at 7:00 am.

Friday, December 23

  • There will be an 180M concrete pour beginning at 10:00 am which is not expected to extend beyond 7:00 pm.

* * *

Holiday Schedule: There are no further concrete pours scheduled over the holidays. The L Tower site at 8 The Esplanade will be open December 28 – 30 and will re-open again on January 3, 2012.

* * *

Happy Holidays!

NOTES:

A Paid Duty Police Officer is on-site daily Monday to Friday, from 7:00 am to 4:00 pm daily to assist with traffic control.

8 The Esplanade – Construction Schedule November 28 – December 3

This is the current construction schedule for 8 The Esplanade – L Tower for the week of November 28 – December 3, 2011

Posted November 30, 2011

Monday, November 28

  • There will be a steel delivery at 7:00 am.

Tuesday, November 29

  • The 180M Concrete Pour was cancelled due to inclement weather. 

Wednesday, November 30

  • Rescheduled from Tuesday: There will be an 180M Concrete Pour beginning at 10:00 am, which is not expected to go past 7:00 pm.

Thursday, December 1

  • There will be a steel delivery at 7:00 am.
  • There will be an 80M Concrete Pour beginning at 2:00 pm, which may go past 7:00 pm.

Friday, December 2

  • There will be a steel delivery at 7:00 am.
  • There will be an 80M Concrete Pour beginning at 2:00 pm, which may go past 7:00 pm.

Saturday, December 3

  • Sub-contractor, Premform, will be working on-site from 9:00 am – 2:00 pm.
  • 1 Paid Duty Officer is scheduled to be on-site.

NOTES:

A Paid Duty Police Officer is on-site daily Monday to Friday, from 7:00 am to 4:00 pm daily to assist with traffic control.

Update for 1 The Esplanade – October 18 – 22

As of Tuesday, October 18, GFL Excavating will start bulk excavating at 1 The Esplanade.

This work is required to create the space for the foundation for the Backstage condominium and the underground parking for the L Tower.

There will be seven dump trucks each doing five loads during day. This work will have short-term but significant impacts on pedestrian and vehicular traffic in the area of Scott and The Esplanade during the work day. The construction management team apologizes in advance for any inconvenience this may cause.

Please check back through the week for updates.